| Sector | abcSugar | Tender Value | N.A. | Location | Uttar Pradesh - India | Ref.No | 85733266 | Closing Date | 31 - Jul - 2025 | | | Work of Fabrication and Erection -Here's the English translation of the provided text, primarily covering mechanical and fabrication work, likely for a sugar mill or similar industrial plant, Removal and replacement of 1/2" to 12" diameter rusted/damaged pipe lines with new pipes., Fabrication and installation of new 1/2" to 12" diameter bends, nipples, crosses, tees, and reducers., Fabrication of new 1/2" to 12" diameter damaged coils., Fabrication and installation of new 6" to 12" diameter flanges., Cutting and removing 14" to 40" diameter damaged pipe lines and fabricating and installing new ones in place., Cutting and removing damaged 14" to 40" diameter bends, nipples, crosses, tees, and reducers, and fabricating and installing new ones in place., Fabrication and installation of new 14" to 40" diameter damaged flanges., Fabrication and installation of new round and square tanks installed in the mill, and connecting all connections in place., 0 to 01 meter diameter., Above 01 meter to 03 meter., Strengthening various locations with heavy structures., Strengthening various locations with light structures., Strengthening and repairing damaged platform plates at various locations., Fabricating and installing/replacing manholes at various locations., Removing old/damaged cones at various locations and fabricating and installing new ones with 8/10 mm plates., 0 to 01 meter diameter., Above 01 meter to 03 meter., Fabricating and installing new casings for damaged fan casings at various locations with 6/8 mm plates., Fabricating and installing new catchers at various stations (including all attachments)., Patching damaged equipment at various stations., Replacing damaged troughs/side plates of cane carrier/bagasse elevator/R.B.C., Removing damaged side plates at various locations and installing new plates., Removing old rubber bases of cane carrier/bagasse elevator/R.B.C. and installing new rubber bases., Removing old rubber of cane carrier/bagasse elevator/R.B.C. and installing new rubber., Removing damaged T-irons and angle irons of cane carrier, straightening bent parts, and reinstalling them., Removing damaged parts of chutes at various locations and installing new ones., Chevron grooving of new rollers of the mill., Chevron grooving of old rollers of the mill., Removing damaged partition plates of juice boxes at the top and bottom of the juice heater and fabricating and installing new ones with 10/12 mm plates., Installing ribs in the top and bottom partitions of the juice heater., Repairing save-alls of the quad., Removing old gutters at various locations and fabricating and installing new ones., Removing old save-alls in pans and quads and fabricating and installing new ones., Fabricating and installing new umbrellas inside the pan and removing old ones., Replacing the ribbon arm of the massecuite receiving crystallizer., Fabricating the separator of a massecuite machine., Removing the trough of the hopper and fabricating and installing a new one., Fabricating and installing separators of continuous machines., Removing tubes of quad juice heater, dynamic juice heater, installing new tubes, expanding them, and giving a satisfactory hydraulic trial. Size 42 mm., Removing tubes of pan, installing new tubes, expanding them, and giving a satisfactory hydraulic trial. Size 96 mm., Removing damaged ducting of both boilers and fabricating and installing new or old plate ducting., Removing damaged plates from the front and roof of boiler no. 1 and 2 and installing new plates., Removing damaged damper of the boiler and fabricating and installing a new one., Fabricating and installing bagasse chutes., Replacing the juice overflow box of the clarifier., Fabricating and installing beds for motor pumps at various locations as per requirement., Replacing 6-inch diameter cooling pipe of sulfur furnace., Removing and installing monitor casing of old machines and giving a trial., Fabricating and installing/replacing manholes at various locations., Fabricating and installing/replacing new internal parts of the pan catcher., Fabricating and installing/replacing new hood of the cane cutter., Removing old bottom plate of the lowest compartment of the clarifier, installing an angle mesh as per instructions, and then installing a new plate on top and giving a satisfactory water trial., Fabricating and installing a new stirrer of the clarifier and giving a satisfactory trial., Removing the shaft of an "ig" mill and removing old bushes from both sides and fitting new ones., Removing and correcting the shaft of the brown sugar magma mixer, reinstalling it, and installing a new bush., Fabricating and installing new trough for the connecting rod of the hopper., Fabricating and installing new catcher strainer., Removing old rail line of the unloader's trolley and satisfactorily fitting the new rail line and leveling it., Flipping and installing the old rail line of the un |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|