| Sector | abcCrude Oil / Natural Gas / Mineral Fuels | Tender Value | N.A. | Location | Uttar Pradesh - India | Ref.No | 51346147 | Closing Date | 22 - Aug - 2022 | | | Supply and installation of telecom and scada equipments - supply of sdh- stm1 equipment, supply of ip/mpls type switch, supply of mpls/tp type switch, supply of converter ac-dc (230 v ac to 48 v dc), supply of converter ac-dc (230 v ac to 24 v dc), supply of converter dc-dc (48 v dc to 24 v dc), supply of converter dc-dc (24 v dc to 48 v dc), supply of battery charger with battery backup , supply of porta cabin, supply of lct, supply of equipment racks, supply of solar panel with battery back up 300 w, supply of solar panel with battery back up 200 w, supply of solar panel with battery back up 50 w, supply of explosion proof telephone, supply of weatherproof telephone, supply of acoustic half hood booth, supply of multi-paired armoured cable, supply of 6 twisted pair, 1.5 sq. mm ( 12 core ), overall aluminium mylar tape shielded with drain wire, supply of 6 twisted pair, 0.50 sq. mm ( 12 core ) individual pair and overall aluminium mylar tape shielded with drain wire, supply of telemetry interface cabinet (tic) , supply of analog phones, supply of fxo gateway , supply of fxs gateway, supply of ethernet switch, supply of rtu, supply of mini rtu, supply of ftc, supply of joint closures, supply of ip camera, supply of spares for telecom, supply of spares for rtu, supply of ethernet to serial converter, supply of optical to serial convereter, supply of rs 232 to rs 422/rs485 converter, supply of optical to ethernet converter, supply of out door equipment panel, supply of field mounted enclosure conforming ip-66 , supply of gprs modem, supply of atex switch 8 port , supply of 24f ofc cable , "total price including all costs, freight, insurance till commissioning, gst etc. , ", part 2 - site work , installation & commissioning of telecom system for each site, integration of sdh equipment with existing nms, installation of ip/mpls equipment , integration of ip/mpls equipment with existing nms, installation of mpls/tp equipment , integration of mpls/tp equipment with existing nms, installation and commissioning of solar system, installation of porta cabin, laying and termination of armoured telephone cable, installation and configuration of converter/switch and interfacing of same with flow computer and integration with scada system , installation of tic panel, design, engineering and submission of documents , testing of ofc and submission of reports , earthing works, installation testing & commissioning of instrumentation cable, installation commissioning and integration of rtus in existing scada server, installation commissioning and integration of mini rtus in existing scada server, installation and integration of ip cameras in existing server for each cameras, installation of gprs modems if supplied as free issue , extending of leased lines for 500 km distance including modems (one ethernet interface & one e1 interface for lan) at both ends, rectification of ofc including supply of joint pit with identification of fault and testing of of cable, installation of outdoor panel , transportation charges for free issue material, laying of ofc through hdd method, laying of ofc through direct trench method, point to point radio communication (2.4/5.8 ghz licence free ism band) , laying of ofc if supplied by gail, blowing of ofc in duct for extending data connectivity to upcoming cgd hookups and lmc connectivities in eastern region. |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|